This works reports on the application of business process re-engineering (BPR) methods to a specific stage in the maintenance activities of the API refinery in Falconara Marittima (AN), i.e. the scheduled annual turnaround. The aim of the study was to analyse the process as it was always implemented up until the year 2001, identifying any related problems and inconsistencies, and then describe the re-engineering of this process, assessing and emphasising the changes involved and pinpointing further opportunities for improvement. Using the synergies provided by the simultaneous adoption of management policies and maintenance management methods enables considerable changes to be made with a view to the production of servicing plans that ensure a greater reliability at the lowest possible cost. The annual turnaround process was modelled using the AIØ WIN software, which supports the IDEFØ method.
An application of BPR and RCM methods to an oil refinery turnaround process / Bertolini, Massimo; Bevilacqua, M.; Ciarapica, F. E.; Giacchetta, G.. - In: PRODUCTION PLANNING & CONTROL. - ISSN 0953-7287. - 16:7(2005), pp. 716-732. [10.1080/09537280500249124]
An application of BPR and RCM methods to an oil refinery turnaround process
BERTOLINI, Massimo;
2005-01-01
Abstract
This works reports on the application of business process re-engineering (BPR) methods to a specific stage in the maintenance activities of the API refinery in Falconara Marittima (AN), i.e. the scheduled annual turnaround. The aim of the study was to analyse the process as it was always implemented up until the year 2001, identifying any related problems and inconsistencies, and then describe the re-engineering of this process, assessing and emphasising the changes involved and pinpointing further opportunities for improvement. Using the synergies provided by the simultaneous adoption of management policies and maintenance management methods enables considerable changes to be made with a view to the production of servicing plans that ensure a greater reliability at the lowest possible cost. The annual turnaround process was modelled using the AIØ WIN software, which supports the IDEFØ method.File | Dimensione | Formato | |
---|---|---|---|
04-2005_PP&C_An application of BPR and RCM methods to an oil refinery turnaround process.pdf
non disponibili
Tipologia:
Documento in Post-print
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
256.24 kB
Formato
Adobe PDF
|
256.24 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.